EB Campbell Hydroelectric Station Breaker Pads

Project completed in 2021

Project Details

The scope of this work included the supply of all labour, materials and equipment to supply and install two concrete foundations for the main substation.

The detailed scope of work completed was as follows:

  • Mobilize manpower, materials, and equipment including one 225 excavator
  • Excavation to 200mm below slab
  • Supply, place & compact 200mm base gravel
  • Supply, place reinforcing steel
  • Supply and install formwork and falsework
  • Supply, place & finish foundations Cleanup & demobilization

Services Provided

  • Excavation, grading, and site preparation for seamless project execution

  • Secure bulk materials transport with side dump and end dump gravel trucks