Ochapowace First Nation Kakisiwew School IA Welding Revisions

Project completed in 2022

Project Details

Concrete/Grout:

Supply and install all items required to complete a 5’x10’ concrete pad to hold a make up air unit including:

  • Excavating and compacting of soil
  • Concrete and grout forms
  • Rebar cage and anchors
  • Concrete and grout
  • Removal of forms and site clean up

HVAC System:

Supply all material, labour, and equipment required to complete the HVAC scope of the project including:

  • Support stand for MUA-2 Make Up Air unit
  • MUA-2 Make Up Air unit
  • Natural Gas piping feed for MUA-2
  • Supply and return air ducting package
  • Exhaust fans
  • Dampers
  • Grilles, Diffusers & Louvres as specified
  • Supply associated control devices

Electrical/HVAC Control:

Supply material, labour, and equipment to complete full scope of electrical work including:

  • Demolition of existing shop electrical wiring and devices as specified
  • Installation, testing, and termination of all cabling/wiring/circuit breakers for electrical system upgrades
  • Installation of new electrical distribution panel
  • Shop receptacles as specified
  • Wiring of controls supplied with HVAC package
  • Update of affected panel schedules

Masonry:

Supply all labour, equipment, and masonry materials to install brick lintels and infill brick, block, AVB, perimeter steel, and insulation

Paint:

Paint interior wall as per specification provided

Commissioning:

Completed testing/commissioning of electrical system upgrades, HVAC system, and associated controls