- Stripped topsoil and rough graded site
- Supplied and installed sanitary sewer and manholes with drop manhole
- Supplied and installed HDPE water line with cut-in tee
- Supplied and installed services to all dwellings
- Supplied and installed culverts and ditching
- Conditioned and shaped road base
- Capped road with road gravel
- Hauled and placed topsoil
Muskowekwan First Nation Healing Lodge
Project completed in 2021